Category Archives: Announcements

IT 211 Project

IT 211 Project Deadline will be on March 19, 2011. Please burn your Flash advertisement in a CD together with an 1/4 index card. In the index card, write the members of your group.

You can submit your project as early as Wednesday,  March 16.

All Projects must be submitted at the EDP.

IT 421 Projects

Here are your project designations. Please comment on this post for corrections

Resume Bank

  • Ardiente, Cutamora, Figues, Layese, Aragon

Online Brochure / Catalog

  • Olores, Belleza, Gerolaga, Montemayor, Baradan

Calendar of Events

  • Olao, Tampus, Rusiana, Capul, Baricuatro

Messaging Board

  • Serenio, Saramosing

Blog

  • Baduel, Encabo, Esmero, Duran, Alforque
  • Guidaven, Gutierrez, Martinez, Oropesa, Fernandez

Online Address Book

  • Malda, Leyte, Tabora, Lecena

IT 421 Final Project

Please group yourselves into 3 4 and select a project from the list below to implement. Please take note that each project can only be implemented by a maximum of 2 groups. Write your members and the project you want to implement on a 1/2 index card. Also write at least 3 projects (1 as your main choice, 2 as an alternate choice in case the first one is already taken). Submit you index card @ EDP, my table

  • Seat Reservation (Movies, Ferry, Airplane, Boat, Bus, Sit-Ins)
  • Online Address Book (Store, View and Update Personal Information)
  • Resume Bank (Store View and Update Resume)
  • Calendar of Events (Store, View and Update Events)
  • Online Brochure/Catalog (Store, View and Update Items)
  • Blog (Create, View and Update Posts)
  • Message Board / Forum (Create, View and Update Topics)
  • Question and Answer (Create, View and Update Questions/Answers)

Project Requirements

1) Instruction Manual (how to use the front-end/back-end of your web application) removed due to time constraints

2) A working LIVE site (please register ahead)

3) Source Code (soft copy for defend, including db schema)

Defend schedule will be announced later. Deadline for Project/Defense:  March 12 3, 2011 (THURSDAY).

Defense will start next week. First come first serve

IT 211 Seatwork

IT 211 (FLASH), kindly study the following topics found at this url http://it27.forummotion.com/f4-basic-lessons.

Please get yourselves a copy (print out) of the topics listed. I will be checking it next meeting.

IT 421 – Assignment

Please read and print a copy of the topics in this url :

http://class.francis-moreno.com/phpbb/viewforum.php?f=6

Specifically the following:

1) Database,

2) Setting Up a Database,

3) Connecting to Database

Printouts will be graded as assignment and checked next meeting Feb 10, 2011.

IT 421 and IT 211 Prelim

Please visit back on this site during these dates December 28, 29 and 30. I will post a link to your Prelim Exam. For the meantime, rest easy and enjoy your Christmas Vacation. Merry Christmas to All

IT 322 and IT 413 Project Deadline

Here are the deadlines for the following projects

1) IT 322 Horoscope – October 14, 2010

Requirements: (Place it in a plastic folder)

  • Horoscope Source Code, Template and Images (1 CD)
  • Print-out of Horoscope Script
  • Compilation of Exercises (Included it in your CD)

Project Defense will start on October 14, 2010 up to October 16, 2010 those who did not submit their project on October 14 will not be given the chance to defend their project. Those who could not defend their project will be given a failing mark.

2) IT 413 CMS - October 16, 2010

Requirements :

  • 2 Soft Bound Copies of the Manual
  • 2 CD’s containing the Project
  • Working Live URL
  • Evaluation Form from the Company/School/Firm
  • Manual must contain the following
  • Cover Page
  • Company Profile
  • Organizational Chart
  • Site Map
  • 3 Draft Templates
  • 1 Final Template
  • CMS User Manual (Backend)
  • PHP Scripts (Frontend, Backend and CSS)

Download the website-evaluation and submit it to the company/firm your website is based from including a copy of the manual and cd.  Those who did not get their project initially checked will not be accepted (checking will end on October 13, 2010). I will be confirming the scores I get from the one who evaluated your site, if I cannot contact that person then the scores will not be recorded. My grade will be based on how you defended your project so all of you must be complete upon submission.

IT 322 Announcement

Deadline for your Final Project (Horoscope) will be on October 14, 2010. I will be expecting the following features on your horoscope.

1) Date Verification (Invalid Dates should not be accepted)

2) Special Characters in entry

3) Horoscope Message should be randomized

Also, I will be checking the 1 remaining exercise for Semi-finals and Finals

1) Switch

2) Arrays

3) Loops

4) File Manipulation

Lecture time will be allocated for finish your project, we will meet only on our Lab Schedule.

IT 413 CMS Project

Here is the sample CMS Project that I said I would upload. Your project would work similar to this. You can view it the frontend here. You can also access the backend in here. Admin access are the following

User : admin
Password : password

Your project must have the following functionality.

1) Create and  Update contents or pages (items, products for E Store)
2) Create and Update links or menus
3) Settings Page for customizing Site Information like (Title, Logo, Slogan and other site information)

I will be expecting 70% completion by October 9, 2010.

IT 322 Announcement

Majority of the class has a failing mark for midterm. To those who want to pass the subject, prepare for a removal exam on Tuesday (September 14, 2010) @ laboratory time [8:00pm to 9:30].

Students who did take the midterm exam may take it on Monday (September 13, 2010 during lecture time) just prepare your excuse letter.